Springwater Corridor

The Springwater Trail crosses over McLoughlin Boulevard (Oregon Route 99E) near Portland's Sellwood neighborhood.

The Springwater Corridor Trail is a bicycle and pedestrian rail trail in the Portland metropolitan area in Oregon, United States. It follows a former railway line of the same name from Boring through Gresham to Portland, where it ends south of the Eastbank Esplanade. Most of the trail, about 21 miles (34 km) long, is paved, though about 1 mile (1.6 km) overlaps city streets in Sellwood, and about 2 miles (3.2 km) near Boring has recently been paved. A large segment roughly follows the course of Johnson Creek, and crosses it on bridges many times. Much of the corridor was acquired by the City of Portland in 1990; remaining segments were acquired by Metro thereafter.[1]

The trail is part of the Portland area's 40 Mile Loop trail system.[2] It connects to many adjacent or nearby parks, including Tideman Johnson Natural Area, Powell Butte, and others.

History

The Springwater Division rail line was named for a planned connection to Springwater, Oregon.[3][4]

The Portland Traction Company operated rail service from Portland to Boring from 1903 until 1989. Passenger service peaked in 1906 and ended in 1958. Oaks Amusement Park—and five other city parks—were built to encourage weekend passenger traffic. Freight trains brought farm produce into Portland.[5]

When the Oregon Department of Transportation (ODOT) began a project to widen Oregon Highway 99E, a new, expensive overpass was required for the rail line. Citing low traffic volumes, construction was refused and the line was put up for sale. This was of great interest to the 40-Mile Loop Trust, a conservation effort formed in 1981[4] to build a trail around Portland connecting its many parks, planned since 1904, but had made little progress. The Trust had proven effective at getting many key governmental agencies to work with each other. They called upon the Southern Pacific and Union Pacific railroads, co-owners of the abandoned line, to transfer the land to the Trust. This matter was subject of a battle between on-line railroad shippers and Metro. However, by 1990, the deal was completed, and represented a significant step in the completion of the Loop.[6][7][8]

During master planning in 1991 for conversion, the projected use of the corridor was 400,000 people annually, distributed as 56% bicycling, 36% walking, 9% jogging, and 3% equestrian. By 2003, usage was expected to exceed one million users per year.[9]

Prior to paving, much of the trail was suitable for mountain biking.[10]

Construction of the eastwest segment of the trail between Oregon Highway 99E and Gresham was completed in 1996. An additional mile east of Gresham was built in 2000. In 2005, a 3-mile (4.8 km) northsouth "Springwater on the Willamette" segment opened between central Portland and the Sellwood Bridge along the Willamette River.[1] Unlike the other sections of the trail, the rail line remained, separated by a fence. The line is currently operated by the Oregon Pacific Railroad.

The last significant section of the trail was completed ahead of schedule in summer 2006, when the construction of three new bridges over Johnson Creek, Oregon Highway 99E and a railroad line, allowing users to cross them without having to detour and mix with traffic on busy streets.[11]

As of 2012, a one-mile gap in the Sellwood area remains, but there are plans to reduce it.[12][13] This segment was one of the parks and trails recommended for funding by a Metro advisory panel in 2001.[14]

In 2003, Portland was one of 25 cities that received a $200,000 grant from Active Living by Design to promote urban planning that encourages physical activity. Some of the money was allocated to a Lents Station interpretive trailhead along the Springwater Corridor.[15]

In 2006, the City of Portland rejected a development proposal for a property that did not include an easement for a greenway along the Willamette River, and would have prevented completion of a planned connection between the Springwater Trail and the Eastbank Esplanade.[16] The easement requirement was upheld by the Oregon Court of Appeals on February 13, 2008.[17]

In late 2013, paving was completed on a 2.25 miles (3.62 km) stretch from Rugg Road to Boring Station Trailhead Park. The vegetation removal for the project started in July 2013 and was completed on December 2, 2013. The paving project cost was $1.9 million.[18]

Present and future

One challenge is that the use by homeless people camping along the trail have increased and also become more aggressive to bicyclists since 2011. A recent Idaho court decision[note 1][19] and more strict anti-discrimination Oregon law[note 2][20] have made law enforcement officers reluctant to take action despite rapes, knifings and other violence.[21]

There is a proposal to continue this trail to connect the 40 Mile Loop to the Pacific Crest Trail[22] with the proposed Cazadero Trail.[23]

Locations

Location Coordinates[24] Trail location[25] Elevation[26]
mi km ft m
S.E. Fourth Ave. and S.E. Ivon St. trailhead 45°30′13.90″N 122°39′42.79″W / 45.5038611°N 122.6618861°W / 45.5038611; -122.6618861 (Springwater Trail at S.E. Fourth and Ivon) 0.0 0 51 16
S.E. Umatilla St. (temporary trail end) 45°27′46.69″N 122°39′38.21″W / 45.4629694°N 122.6606139°W / 45.4629694; -122.6606139 (Springwater Trail at Umatilla St.) 3.1 5.0 70 21
S.E. 19th Ave. and Ochoco St. (trail resumes) 45°27′31.49″N 122°38′41.81″W / 45.4587472°N 122.6449472°W / 45.4587472; -122.6449472 (Springwater Trail at S.E. 19th and Ochoco) 4.2 6.8 73 22
Tideman Johnson Natural Area 45°27′47.69″N 122°37′26.12″W / 45.4632472°N 122.6239222°W / 45.4632472; -122.6239222 (Springwater Trail at Tideman Johnson Park) 5.1 8.2 103 31
Interstate 205 45°28′20.23″N 122°33′58.25″W / 45.4722861°N 122.5661806°W / 45.4722861; -122.5661806 (Springwater Trail at I-205) 8.7 14.0 206 63
Linneman Station 45°29′14.26″N 122°28′31.19″W / 45.4872944°N 122.4753306°W / 45.4872944; -122.4753306 (Springwater Trail at Linneman Station) 13.4 21.6 266 81
S.E. 267th Ave. and S.E. Rugg Rd. trail access 45°27′37.34″N 122°23′17.73″W / 45.4603722°N 122.3882583°W / 45.4603722; -122.3882583 (Springwater Trail at 267th Ave.) 18.9 30.4 427 130
Boring (recently paved) 45°25′54.70″N 122°22′31.19″W / 45.4318611°N 122.3753306°W / 45.4318611; -122.3753306 (Springwater Trail at Boring) 21 34 approximately517 158

See also

Gallery

Notes

  1. Bell v. City of Boise, 993 F. Supp. 2d 1237, No. 1:09-cv-540-REB (D. Idaho 2014) Janet F. Bell, et al., Plaintiffs, v. City of Boise, et al.
  2. 2015 House Bill 2002

References

  1. 1 2 "Springwater Corridor". Portland Parks & Recreation. Retrieved July 27, 2012.
  2. Tsui, Bonnie (October 22, 2004). "Running on Trails, Not the Mean Streets". New York Times. Retrieved July 27, 2012.
  3. "Springwater Corridor Map" (PDF). Portland Parks & Recreation. Retrieved July 27, 2012.
  4. 1 2 Cohen, Scott. "Springwater Corridor". Oregon Encyclopedia. Portland State University. Retrieved July 27, 2012.
  5. "Springwater Corridor, SE Ivon St to Boring, Oregon". Portland Parks & Recreation. Retrieved July 13, 2009.
  6. Charles E. Little (1990). Greenways for America. JHU Press. pp. 76–80. ISBN 0-8018-5140-8. Retrieved May 30, 2008.
  7. Tomlinson, Stuart (August 26, 2007). "On Springwater's Open Road, There's Lots to See". The Oregonian.
  8. "Foster Auto Parts v. City of Portland, 15 P.3d 573 (Or. App., 1998)". December 6, 2000. Retrieved May 31, 2008.
  9. George M. Hudson, Landscape Architect, former City of Portland Park Planner, Trail Program Manager. "Case Study No. 32, Portland, Oregon". PEDSAFE, Trail Intersection Improvements. Federal Highway Administration. Retrieved July 13, 2009.
  10. Norris, Mike (May 14, 2002). "Mountain Biking in Portland". Daily Vanguard.
  11. Johns, Anna (April 18, 2006). "Getting Close to Closure". Portland Tribune. Retrieved May 4, 2013.
  12. "Sellwood Gap Shrinks with Help from Voter-Approved Natural Areas Program". Metro Regional Government. 2012. Retrieved July 27, 2012.
  13. "Metro Closes More Than Half of the Sellwood Gap, Allowing the Springwater Corridor to Expand in Southeast Portland". Metro Regional Government. September 23, 2010. Retrieved July 27, 2012.
  14. Vesbach, Jeremy (December 11, 2001). "15 Local Sites Suggested for New Parks". Daily Journal of Commerce.
  15. Curl, Aimee (April 12, 2003). "Portland Receives Funds to Design for Active Living". Daily Journal of Commerce.
  16. Jenniges, Amy (June 29, 2006). "War Path: Property Owner Kicks up Stink over Public Trail". The Portland Mercury. Retrieved July 27, 2012.
  17. Law, Steve (March 18, 2008). "Ruling Clears Way for Riverfront Link". Portland Tribune. Retrieved 2014-10-23.
  18. "Springwater Corridor Trail". December 2, 2013. Retrieved 2015-05-11.
  19. Tiffany Ashton (November 19, 2015). "Arrested for being Homeless: Anomaly or Reality?". University of Baltimore Law Review. Retrieved May 9, 2016.
  20. "House Bill 2002; Relating to public safety; declaring an emergency. Directs law enforcement agencies to adopt written policies and procedures prohibiting profiling by January 1, 2016.". Your Government. Oregonian. July 13, 2015.
  21. Jonathan Maus (January 14, 2016). "Springwater path users feel threatened by campers, police say their hands are tied". Bike Portland. Retrieved May 9, 2016.
  22. "40 Mile Loop map" (PDF). 40-Mile Loop Land Trust. Retrieved July 10, 2008.
  23. "Cazadero Trail". Metro (Oregon). Retrieved August 16, 2013.
  24. Geolocated with Google Earth
  25. Moore, Jim (2012). 75 Classic Rides Oregon: The Best Road Biking Routes. Seattle: The Mountaineers Books. pp. 98101. ISBN 978-1-59485-650-1.
  26. Derived from Google Earth

External links

Coordinates: 45°28′34″N 122°33′24″W / 45.4762309°N 122.5567588°W / 45.4762309; -122.5567588

This article is issued from Wikipedia - version of the 11/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.