Bloor GO Station

Bloor
Location 1456 Bloor Street West
Toronto, Ontario
Canada
Coordinates 43°39′28″N 79°27′03″W / 43.65778°N 79.45083°W / 43.65778; -79.45083Coordinates: 43°39′28″N 79°27′03″W / 43.65778°N 79.45083°W / 43.65778; -79.45083
Owned by Metrolinx
Platforms 2 island platforms
Tracks 3 + 1 bypass
Connections Dundas West (TTC)
Construction
Parking None
Other information
Station code GO Transit: BOGO
Fare zone 02
History
Opened 1974
Rebuilt 2015
Services
Preceding station   GO Transit   Following station
toward Kitchener
Kitchener
Terminus
Union Pearson Express
UP Express
Terminus

Bloor GO Station is a railway station on GO Transit's Kitchener line and Union Pearson Express rail services, located in Toronto, Ontario, on Bloor Street east of Dundas Street West. It is near Dundas West station on the TTC's Bloor–Danforth line, but is not directly connected to it.

Overview

Planned track and platform configuration. As of 2016, tracks 1 and 6 have not yet been installed

The station is located north of Bloor Street West between Lansdowne Avenue and Dundas Street West. Bloor Street dips down here to cross under all the tracks, and the station is reached by stairs from its north sidewalk.

Bloor station serves eastbound and westbound Kitchener line and UP Express trains on the Weston Subdivision, locally oriented northwest-southeast. Following the Georgetown South railway expansion in 2015, the Weston subdivision is designed to have four tracks with two island platforms, each with a high-level section for the UP Express and a low-level section for the Kitchener line. However, as of 2016, the line only has three tracks, making the northernmost platform effectively a side platform.

Parallel to these tracks along their southwest side, is the Galt Subdivision which carries the Milton line. There is no platform for Milton line services, so those trains pass by the station without stopping. GO has considered adding the station to the Milton line,[1] but it is not in current plans.[2]

Until 1996 there was an additional parallel track on the northeast side of the station which belonged to the Canadian Pacific Railway and was used for access to local industries. Its former right-of-way is now used for the West Toronto Railpath, providing a pedestrian and cyclist connection to the neighbourhoods to the north, east, and south. Covered bicycle parking is located at the station's entrances from the path. Bloor is one of the few GO stations which does not have any parking for cars.

Prior to the introduction of Union Pearson Express, only 200 passengers used the station per day, a number which was expected to increase to 1,000 with the opening of the UP Express. Metrolinx is projecting 2,000 riders will use the station daily by 2031.[3] UPX president Kathy Haley said 25 per cent of UPX riders are expected to use Bloor Station.[4]

Georgetown South Expansion

Bloor station was substantially rebuilt as a part of the Georgetown South railway expansion project to allow for Union Pearson Express service. The formerly 2-track Weston Subdivision was expanded to 4 tracks, and the former side platforms became island platforms. High-level sections were added at the southeast end of each platform near Bloor street for use by the Union Pearson Express, and the low-level sections for the Kitchener line were correspondingly lengthened at the northwest end.

Other improvements to the station include an indoor concourse at street level with a staffed ticket booth, elevators, heated shelters, bicycle storage and signage.[3][4]

In February 2016 a kiss-and-ride was opened at Dundas Street West and Edna Avenue, connecting to a new second entrance to the station.[5]

Connection to Dundas West station

Dundas West subway station has only a single entrance, on Dundas Street, so passengers connecting to Bloor station must walk eastward for some 200 metres along city streets. Since the subway platforms happen to extend eastward from the station entrance, a direct tunnel from the GO station to the east end of the subway station would be relatively short. In March 2011 when Metrolinx announced the station expansion plans associated with the Georgetown South Project, the second entrance to the station was to have a direct connection to the Dundas West subway platforms. In the fall of 2012 when construction began, work did not include an underground TTC connection,[6][7] which was to be completed instead in 2017.[4] However, in March 2016, Metrolinx officials said it will take five years to build a tunnel between the two stations because of the need to expropriate property.[8]

References

  1. "GO rail Options Benefits Case Assessment" (PDF). p. 9. Retrieved 2010-11-03.
  2. Steve Munro. "Neptis Reviews Metrolinx: A Critique (II)". Archived from the original on 2015-03-04. Retrieved 2014-04-30.
  3. 1 2 "GO and TTC make a connection at Dundas West" Tess Kalinowski, Toronto Star. March 22, 2011
  4. 1 2 3 Tess Kalinowski (2015-05-22). "Union Pearson Express riders at Bloor face two-year wait for tunnel to TTC". Toronto Star. Retrieved 2015-05-22.
  5. Government of Canada (9 February 2016). "Improving GO Bloor Station for Commuters in Toronto". News Canada. Retrieved 2016-05-10.
  6. "Dundas West - Bloor Mobility Hub Public Open House". Metrolinx. Retrieved 23 May 2014.
  7. "Dundas West - Bloor Mobility Hub Public Open House" (PDF). Metrolinx. 12 December 2012. Retrieved 23 May 2014.
  8. Tess Kalinowski, Transportation reporter (17 March 2016). "Union Pearson Express ridership spikes after fare reduction". Toronto Star. Retrieved 2016-03-17.

External links

Media related to Bloor GO Station at Wikimedia Commons


This article is issued from Wikipedia - version of the 11/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.