USNS Neptune (ARC-2)

For other ships with the same name, see USS Neptune.
History
Name: USS Neptune ex William H. G. Bullard
Builder: Pusey & Jones Corp., Wilmington, Delaware
Launched: 22 August 1945
Commissioned: 1 June 1953
Decommissioned: 1991
Struck: 20 August 1992
Fate: Recycled in late 2005
Notes: Ship underwent modifications as USS Neptune and a major modernization in 1982 with resulting changes in specifications.
General characteristics
Type: S3-S2-BP1; Army cable ship, later USN Cable Repair Ship (ARC)
Displacement: 7,400 long tons (7,519 t)
Length: 362 ft 0 in (110.34 m)
Beam: 47 ft 0 in (14.33 m)
Draft: 25 ft (7.6 m)
Propulsion: 2 × Skinner Uniflow Reciprocating Steam Engines; changed to turbo-electric in 1982; twin shafts
Speed: 14 knots (26 km/h; 16 mph)
Complement: 71 civilians, 6 Navy, 25 technicians
Armament: None

USNS Neptune (ARC-2), was the lead ship in her class of cable repair ships in U.S. Naval service. The ship was built by Pusey & Jones Corp. of Wilmington, Delaware, Hull Number 1108, as the USACS William H. G. Bullard named for Rear Adm. William H. G. Bullard. She was the first of two Maritime Commission type S3-S2-BP1 ships built for the US Army near the end of World War II. The other ship was the Albert J. Myer, which later joined her sister ship in naval service as the USNS Albert J. Myer. The ship was built by Pusey & Jones Corp. of Wilmington, Delaware as Hull Number 1108.[1]

Function

Neptune's assignments were typically to transport, deploy, retrieve and repair submarine cables, test underwater sound devices, and conduct acoustic, hydrographic, and bathymetric surveys.

Career

After completion for the US Army Signal Corps in February 1946, Neptune was handed to the Maritime Commission and placed in the reserve fleet.[2][3]

In 1953, Neptune was activated by the Navy to support the SOSUS program. She went to the Bethlehem Steel Co. in Baltimore, Maryland for a number of modifications: e.g., electric cable machinery (in place of steam), precision navigation instrumentation, and a helicopter platform over the fantail. She was commissioned on 1 June 1953 as a regular Navy ship USS Neptune (ARC-2), with Cdr. Robert A. Bogardus in command.

In 1973, Neptune transferred to the Military Sealift Command (MSC), was re-designated T-ARC-2, and continued operations with a mostly civilian crew. Neptune was extensively modernized in 1982 by General Dynamics Corp. in Quincy, Massachusetts, and that work included new turbo-electric engines. It is said that Neptune and sister ship USNS Albert J. Myer (T-ARC-6) were the last ships in the Navy to operate using reciprocating steam engines.

Neptune performed cable repair duties all over the world until 1991, when she'd been in service for some 38 years. During her career, she received a Navy E ribbon in 1988.

Inactivated in 1991, she was eventually placed in the James River reserve fleet near Ft. Eustis, VA. The ex-Neptune was dismantled and recycled by International Shipbreaking Ltd. of Brownsville, TX in late 2005.

References

  1. http://www.shipbuildinghistory.com/history/shipyards/2large/inactive/pusey.htm | Shipbuilding History - Pusey & Jones, Wilmington DE
  2. Grover, David H. (1987). U.S. Army ships and watercraft of World War II. Annapolis, Md.: Naval Institute Press. p. 144. ISBN 0-87021-766-6.
  3. "USNS Neptune (T-ARC-2)". NavSource Online. Retrieved 28 September 2016.


This article is issued from Wikipedia - version of the 9/28/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.