Redcliffe Peninsula railway line

Redcliffe Peninsula line
Overview
Type Commuter Rail
Status Open
Locale Murrumba Downs, Queensland, Australia
Termini Petrie Station
Kippa Ring Station
Stations 6
Colour on map 1e90ff
Website queenslandrail.com.au
Operation
Opened 4 October 2016
Owner Queensland Rail
Operator(s) Queensland Rail
Technical
Line length 13 km (8.1 mi)
Number of tracks 2
Track gauge 3 ft 6 in (1,067 mm)
Operating speed 100 km/h (62 mph)

Mango Hill Station under construction (March 2015)
Kippa Ring Station under construction, project sign

The Redcliffe Peninsula line is a 12 km stretch of heavy gauge dual-track railway between Petrie and Kippa-Ring on the Redcliffe peninsula.[1] The new line is part of the QR Citytrain suburban network, branching from the Caboolture line. It starts 200 metres north of Petrie railway station, extending from (27.5 km (17.1 mi) to 40.1 km (24.9 mi) north of Central railway station).

The line has six stations: Kallangur, Murrumba Downs, Mango Hill, Mango Hill East (previously called Kinsellas Road), Rothwell and Kippa-Ring. Funding for the project consisted of $742 million from the Commonwealth Government, $300 million from the Queensland Government (plus another $120 million for land) and $105 million from the Moreton Bay Regional Council.[1]

The line was offically opened on 3 October 2016, about 130 years after it was first proposed.[2] The first train to depart from Kippa-Ring at 3:46am was SMU (295) & (296), with 50 people on board for the historic trip.

Early history

A rail line to Redcliffe was first proposed in 1895 when the Queensland Government's Minister for Railways, the Hon. Robert Philp, considered three proposals, preferring a route via North Pine (Petrie).[3] In more recent times, the route for a Redcliffe railway was identified in the 1970s, and the required land was purchased and preserved as a transport corridor by the state government in the 1980s.[4] The issue of the proposed railway line seemed to be a recurrent theme during state elections, leading to scepticism the line would ever be constructed.

Petrie to Kippa-Ring Public Transport Corridor Study

In 1999, the newly elected state government commissioned an investigative study into the transport corridor between Petrie to Kippa-Ring,[5] conducted by GHD Group. Key components under investigation included the mode of transport, the route and location of stations, future public transport usage, and the timing of construction.[6]

The study was conducted in two parts. The first was completed in June 2000. It aimed to meet the state government's obligations to identify or forgo rights to a transport corridor running through the North Lakes residential development. This first stage was to decide on the preferred mode of transport, the viability of public transport along the corridor, and the preferred alignment of the corridor.[4] Four modes of transport were investigated: heavy rail, buses or a busway, light rail, and monorail. It was decided that heavy rail was the preferred mode of transport along the existing preserved corridor as it was the only option to give an acceptable level of economic efficiency. The study found that heavy rail had a benefit-cost ratio of 1.46, and would generate the highest levels of patronage due to its integration into the existing Citytrain network, requiring no change mode.[4]

The second part of the study was completed in October 2003. It looked at the route of the corridor between Petrie railway station and Kallangur railway station at Goodfellows Road. The original, preserved route was recommended.[4]

On 17 December 2001, the Minister for Transport announced public transport improvements between Petrie and Kippa-Ring, planned as part of a staged development of a new rail line in the area,[7] following the release of the recommendations of the draft report of the Petrie to Kippa-Ring Public Transport Corridor Study. The Minister also said that the government was investigating private sector involvement in the construction of the project.[7] On 11 July 2003, the Minister said that the government had not made a commitment on the proposed line, and that it may not go ahead because interest from the private sector in the project was negligible.[8] This was at a time when similar passenger rail public-private partnerships such as the Airtrain to the Brisbane Airport and Airport Link to Sydney Airport were faltering.[9][10]

In June 2004, Queensland Transport released the Petrie to Kippa-Ring Public Transport Corridor Study's Impact Assessment Study. It claimed that the Impact Assessment Study only looked at costs of the Petrie to Kippa-Ring corridor, and did not take into account commercial-in-confidence costs involved in operating the trains, integrating the services with the rest of the Citytrain network, higher maintenance costs, and the costs of increasing capacity between the Brisbane central business district and Petrie. Based on these higher costs, Queensland Transport deemed the construction of the railway by 2007 could not be justified. The report also said possible savings from a public-private partnership were small and would not provide value for money. Queensland Transport said that it would preserve the corridor until it was required.[11] On 15 June 2004 the government announced $3 million for improving existing bus services along the corridor between Kippa-Ring (Redcliffe) and Petrie "in the short to medium term". However, it again announced the continuing preservation of the reserved corridor for future public transport use.[12]

Recent history

Site of Kippa-Ring railway station prior to construction.

Frustrated by a lack of action by the Government, the Redcliffe City Council (now Moreton Bay Regional Council) unanimously moved on 4 July 2005 to support a campaign to have the Petrie to Kippa-Ring railway built, and to write to the Minister for Transport to express concern over the decision to not proceed with its construction.[13] In 2007, the Pine Rivers Shire Council (now a part of Moreton Bay Regional Council along with Redcliffe City Council) purchased the old Tulip Town shopping centre land at Kallangur for $6 million, with the potential for it to be used with the proposed Kippa-Ring railway line.[14] The site is nearby, but not immediately adjacent to, the location of a Murrumba Downs railway station. On 11 August 2008, the then state member for Murrumba through whose electorate the proposed line runs, said that there were no plans to construct the railway in the foreseeable future.[15]

The South East Queensland Regional Plan 2009–2031, released in December 2008, identified the preserved corridor in its Transport Infrastructure Network Plan as a "quality rapid transit route".[16] During the 2009 Queensland state election, the then opposition party promised to start the construction of the line in its first term if it was elected, with the first stage of the line from Petrie to Mango Hill commissioned in 2014, and completed to Kippa-Ring by 2016.[17] However, the incumbent government was subsequently returned to power.[18]

During the 2010 federal election, then Prime Minister Julia Gillard announced that the Kippa-Ring railway line would be fast-tracked, with the project to be complete by 2016 at a cost of $1.15 billion.[19] On 3 December 2010, the funding agreement for the project was formalised, after being announced the day before. The agreement was signed by the Prime Minister Julia Gillard, Queensland Premier Anna Bligh and Moreton Bay mayor Allan Sutherland.[20]

The Department of Transport and Main Roads held an industry briefing in Brisbane on 17 August 2012 to provide an update on the Moreton Bay Rail Link Project (MBRL). The Request for Proposal was advertised on 24 August 2012 with responses closing on 21 September 2012. The procurement process to select a single design-and-construct contractor utilised a modified Early Contractor Involvement (ECI) process.

On 1 August 2013,[21] Thiess Pty Ltd, a subsidiary of Leighton Holdings (with designers Aurecon, AECOM and geotechnical subcontractor Golder Associates) was awarded the $650 million contract for the design and construction of the new rail line. Thiess was part of the Trackstar team building the 12.6 kilometres (7.8 mi) Moreton Bay rail link.

On 30 May 2016, The Queensland Government announced [22] that the rail link had been delayed indefinitely from its original mid-late 2016 opening period, due to signalling system faults that had been detected at Petrie, where the new line met the existing rail system. Testing indicated that the signalling system in its current configuration was unable to handle all the simultaneous rail movements at the junction, and would cause train delays right across the entire QR City Network.[23]

On 31 August 2016, the Transport Minister Stirling Hinchliffe announced in Parliament that the Moreton Bay Rail Link would open on 4 October 2016, with an open day the day before.[24]

A shortage of drivers owing to the increased requirements created by the new line resulted in mass cancellations of services across the Brisbane rail network, with over 100 services cancelled on the 21st of October.[25] After an admission of fault, Queensland Rail CEO Helen Gluer resigned over the debacle, as did the chairman Michael Klug.[26]

Timeline

Milestones:[27]

Line guide and services

Most services to and/from Kippa-Ring continue on to the Springfield line. Redcliffe Peninsula services run express between Northgate and Bowen Hills, stopping only at Eagle Junction. The typical travel time between Kippa-Ring and Brisbane City is approximately 56 minutes (to Central).[28]

Passengers for/from the Caboolture and Nambour and Gympie North lines change at Petrie, Shorncliffe line at Northgate, Airport and Doomben lines at Eagle Junction, Ferny Grove line at Bowen Hills, and all other lines at Central.

Kippa-Ring railway line
showing distance from Central and ticket zone

Ipswich & Rosewood, Springfield, Tennyson lines
Beenleigh, Cleveland, Gold Coast lines
Exhibition line
0.8 km Roma Street(1)
0.0 km CENTRAL(1)
1.3 km Fortitude Valley(1)
Exhibition line
2.7 km Bowen Hills
2.7 km Bowen Hills
Inner City Bypass
Ferny Grove line
Breakfast Creek
4.5 km Albion(2)
5.3 km Lutwyche (closed)
5.6 km Wooloowin(2)
6.1 km Thorroldtown (closed)
6.5 km Eagle Junction
Doomben line
Airport line
Schulz Canal
7.8 km Toombul(2)
8.7 km Nundah(2)
9.9 km Northgate(2/3)
Shorncliffe Line
11.2 km Virginia(3)
12.4 km Sunshine(3)
13.4 km Geebung(3)
14.9 km Zillmere(3/4)
16.6 km Carseldine(4)
Gympie Arterial Road
20.0 km Bald Hills(4/5)
South Pine River
22.4 km Strathpine(5)
Strathpine Tramway(closed)
23.8 km Bray Park(5)
25.8 km Lawnton(5/6)
North Pine River
27.4 km Petrie(6)
Caboolture line, Sunshine Coast line
Kallangur (6)
Murrumba Downs (6)
Bruce Highway
Mango Hill (6)
Mango Hill East (6)
Saltwater Creek
Rothwell (6)
40.1 km Kippa-Ring (6)

References

  1. 1 2 "Moreton Bay Rail Link (Department of Transport and Main Roads)". Queensland Government. 15 November 2010. Retrieved 24 November 2010.
  2. Schwarten, Evan. "Brisbane rail link opens 130 years late". News.com.au. News Corp Australia. Australian Associated Press. Retrieved 5 October 2016.
  3. "(Unknown title)". The Telegraph. 8 May 1895. Retrieved 19 January 2009.
  4. 1 2 3 4 GHD Pty Ltd (October 2003). "Petrie to Kippa-Ring Public Transport Corridor Study – Final Impact Assessment Study Report" (PDF). Queensland Transport. Retrieved 20 January 2009. Archived 20 November 2008 at the Wayback Machine.
  5. "BUDGET BRIEFS" (Press release). Government of Queensland. 15 September 1999. Retrieved 20 January 2009.
  6. "Public transport corridor information days to assist residents" (Press release). Government of Queensland. 24 March 2000. Retrieved 20 January 2009.
  7. 1 2 "Petrie to Kippa-Ring Rail Corridor" (Press release). Government of Queensland. 17 December 2001. Retrieved 20 January 2009.
  8. "Rail may not be an option for Petrie to Kippa-Ring" (Press release). Government of Queensland. 11 July 2003. Retrieved 20 January 2009.
  9. "Talks underway over future of private Airtrain operation". Australian Associated Press. 15 June 2002. Retrieved 20 January 2009.
  10. Bissett, Kelvin (18 December 2006). "Fast rail plan for Sydney". The Daily Telegraph. Retrieved 20 January 2009.
  11. "Petrie to Kippa-Ring PublicTransport Corridor Study Independent assessment of IAS Report" (PDF). Queensland Transport. June 2004. Retrieved 20 January 2009.
  12. "$3M FOR PETRIE TO KIPPA-RING PUBLIC TRANSPORT CORRIDOR" (Press release). Government of Queensland. 15 June 2004. Retrieved 20 January 2009.
  13. "MINUTES OF GENERAL PURPOSES COMMITTEE 4 JULY 2005" (DOC). General Purposes Committee Meeting. Redcliffe City Council. 4 July 2005. Retrieved 20 January 2009.
  14. Dowling, Bernie (21 November 2007). "Petrie-Redcliffe line hopes". Pine Rivers Press. Archived from the original on 24 November 2007. Retrieved 20 January 2009.
  15. "No rail link to Redcliffe". Redcliffe and Bayside Herald. 12 August 2008. Retrieved 20 January 2009.
  16. "Draft regional plan 2009–2031 – Part D12: Integrated transport" (PDF). Government of Queensland. 5 December 2008. Retrieved 20 January 2009.
  17. Valentine, Alyce (28 February 2009). "Petrie to Kippa-Ring rail link promised by the LNP". The Courier Mail. Archived from the original on 28 February 2009. Retrieved 28 February 2009.
  18. "Queensland elects female premier". BBC News Online. 21 March 2009.
  19. Balogh, Stefanie (27 July 2010). "Gillard fast-tracks the $1.15 billion Redcliffe rail connection linking Petrie to Kippa-Ring". The Courier Mail. Retrieved 24 November 2010.
  20. Moore, Tony (3 December 2010). "Moreton Bay Rail Link remains on track". The Brisbane Times (Fairfax Media). Retrieved 3 December 2010.
  21. AAP (1 August 2013). "Thiess to lead Brisbane rail project". The Australian.
  22. "Statement on Moreton Bay Rail Link Project" (Text). Minister for Transport. 2016-05-30. Retrieved 2016-05-30.
  23. "Signalling faults delay Moreton Bay Rail Link" (Text). ABC News. 2016-05-30. Retrieved 2016-05-30.
  24. "Qld's Moreton Bay rail to open in October" (Text). News.com.au. 2016-08-31. Retrieved 2016-08-31.
  25. "Queensland Rail apologises over train cancellations" (Text). ABC News. 2016-10-21. Retrieved 2016-11-01.
  26. "Former QR boss Helen Gluer receives almost $160000 payout" (Text). ABC News. 2016-11-01. Retrieved 2016-11-01.
  27. "TMR MBRL". Moreton Bay Rail Link. Queensland Government, Department of Transport and Main Roads. 15 June 2012. Retrieved 15 August 2014.
  28. "Redcliffe Peninsula line timetable" (pdf). TransLink. 4 October 2016. Retrieved 2 October 2016.