Jefferson North Assembly

Jefferson North Assembly Plant (JNAP) is a Chrysler automobile assembly factory in Detroit, Michigan. Located on East Jefferson Avenue 6 mi (9.6 km) from downtown, near Grosse Pointe Park, the factory opened in 1991 as a major commitment to the downtown Detroit area by Chrysler, and was expanded in 1999, bringing its area to 2,700,000 sq ft (250,000 m2) and expanded again in 2011, bringing its total to 3,000,000 sq ft (280,000 m2). Its first product was the Jeep Grand Cherokee from the start, which it continues to produce to this day. It uses the original site of the Hudson Motor Company location that was originally built during the 1940s as a storage lot for newly manufactured vehicles to the east of the facility.

History

Jefferson North is the only auto assembly plant that is entirely within the city limits. A second plant, Detroit/Hamtramck Assembly owned by General Motors, where Cadillacs are manufactured, is partly in Detroit and partly in the neighboring city of Hamtramck.[1]

Chrysler announced in August 2008 a 1.8-billion-dollar investment in the plant that would expand it by 285,000 sq ft (26,500 m2) and upgrade the facility for the production of a new product in 2010.[2] Improvements in the plant occurred during a period of intense corporate turmoil for the parent company. Daimler-Benz had sold its majority stake to Cerberus Capital Management in 2007. Cerberus and the United Auto Workers agreed in 2007 to a plan whereby entry workers are paid $16/hour compared to $28 for long-term UAW employees.[1] The Cerberus-owned company went into bankruptcy in 2009 with the company getting a multibillion-dollar bailout by the United States government before ultimately being acquired by Fiat in 2011.

In 2013, more than 300,000 cars a year were being produced at the plant and its work force was reported at 4,600 working, with the plant in operation 24 hours a day.[1] The crews work an "alternative work schedule" (AWS) known as 3-2-120 that does not require Chrylser to pay overtime or weekend pay. The schedule was part of the bailout package. Each crew works 10 hours a day for 4 days ("A” 6 a.m. to 4:30 p.m. Monday through Thursday; “B” 6 p.m. to 4:30 a.m. on Wednesday through Saturday; “C” 10 hours on the night shift Monday and Tuesday and 10 hours on the day shift Friday and Saturday).[3] The 3/2/120 comes from a practice of working for three days, taking off two (plus Sunday for everyone) so that everyone works 120 hours over every three weeks.[4]

In August 2013, the Jefferson North Assembly Plant produced its 5,000,000th vehicle since it first made the 1993 Jeep Grand Cherokee ZJ in 1992. The vehicle was a 2014 Jeep Grand Cherokee WK2 Overland. A decal was placed on the windshield of the vehicle to signify that it was the 5,000,000th vehicle produced at the Jefferson North Assembly Plant. The vehicle was donated to the USO, whom Jeep and Chrysler Group support. A 1993 Jeep Grand Cherokee Laredo 4X4 is also on display at JNAP to celebrate this milestone.

President Barack Obama visited the plant in 2010 to speak to the workers at the plant. He said that the first new vehicle he ever owned was a 2000 Jeep Grand Cherokee Limited.

On May 5, 2015, Fiat Chrysler announced that an employee had been killed at Jefferson North's wastewater treatment plant.

Products Made (model years)

Past (model years)

Future Products

Jefferson Avenue Assembly

Prior to the opening of Jefferson North Assembly in 1991, Chrysler operated the adjacent Jefferson Avenue Assembly plant from 1925 through 1990 at Jefferson Ave & Clairpointe Avenue, between the streets of East Jefferson Avenue and Freud Street. It had access to Conner Creek, and it is now the Conner Creek CSO Control Facility. The factory was originally built in 1907 to produce Chalmers automobiles, and later Maxwell automobiles. In 1925, the newly formed Chrysler Corporation took over the plant to build its flagship Imperial. In addition to Imperials, various other models from Chrysler, DeSoto, Dodge, and Plymouth would eventually be assembled here. The plant officially closed in February 1990 and was razed a year later. The Jefferson Avenue Assembly was in close proximity to the Dodge Main factory in nearby Hamtramck, and the Plymouth Lynch Road Assembly in Highland Park.

References

  1. 1 2 3 Last Car Plant Brings Detroit Hope and Cash - New York Times - July 16, 2013
  2. JEFFERSON NORTH EXPANSION, UAW-Chrysler National Training Center News, August 13, 2008
  3. http://www.wsws.org/en/articles/2012/11/shif-n30.html
  4. http://www.autonews.com/article/20120307/BLOG06/120309878#axzz2ZDow0GEw

See also

External links

Coordinates: 42°22′18″N 82°58′01″W / 42.371759°N 82.96698°W / 42.371759; -82.96698

This article is issued from Wikipedia - version of the 10/9/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.