Downtown Seattle Transit Tunnel

"DSTT" redirects here. For the Nintendo DS storage device, see Nintendo DS storage devices § DSTT. For the Division of Signal Transduction Therapy at the University of Dundee, see Division of Signal Transduction Therapy.
Downtown Seattle Transit Tunnel

Two large tunnel tubes with rails embedded in concrete running into them

The southbound portal at Westlake station
Overview
Other name(s) Metro Bus Tunnel
Line


King County Metro: 41, 74, 101, 102, 150, 255
Sound Transit Express: 550

Location Seattle, Washington
System Sound Transit Link Light Rail, Sound Transit Express, King County Metro
Start 9th Avenue and Pine Street
End 5th Avenue S and S Jackson Street
No. of stations 5
Operation
Work begun March 6, 1987 (1987-03-06)
Opened September 15, 1990 (1990-09-15)
Rebuilt 20052007
Reopened September 24, 2007 (2007-09-24)
Owner King County Metro
Operator King County Metro, Sound Transit
Traffic Light rail, bus
Technical
Length 1.3 miles (2.1 km)[1]
No. of tracks Double
Track gauge 4 ft 8 12 in (1,435 mm)
Electrified 1,500 V DC, Overhead catenary[2]
Operating speed 30 mph (48 km/h)
Width 18 ft (5.5 m)
Route map
Downtown Seattle Transit Tunnel

Interstate 5 North

Convention Place
Link light rail
Central Link
to University of Washington
Westlake
University Street
Pioneer Square

International District/Chinatown
Interstate 90 East
SODO Busway
to Interstate 5 South
Link light rail
Central Link
to Angle Lake

 Key 
bus/rail tunnel station

bus only station

The Downtown Seattle Transit Tunnel (DSTT), also referred to as the Metro Bus Tunnel, is a 1.3-mile-long (2.1 km) pair of tunnels for public transit that run northsouth under 3rd Avenue through Downtown Seattle, Washington from 9th Avenue and Pike Street to 5th Avenue South and South Jackson Street. The double-track tunnel and its stations, with the exception of Convention Place, constitute parts of the Central Link light rail line, which continues north to University of Washington station and south through the Rainier Valley to Seattle–Tacoma International Airport as part of Sound Transit's Link Light Rail network. All five of its stations are also served by buses from King County Metro and Sound Transit Express that leave the tunnel north via Interstate 5, south via the SODO Busway, or east via Interstate 90. The DSTT is the busiest section of the Link Light Rail network, with an average of over 10,000 weekday boardings. It is owned by King County Metro and shared with Sound Transit, having signed a joint-operating agreement after ownership was transferred back to King County in 2002.[3][4] The Downtown Seattle Transit Tunnel is one of two rail-bus tunnels in the United States, alongside the Mount Washington Transit Tunnel in Pittsburgh, Pennsylvania. However, the DSTT is the only rail-bus tunnel in the United States with stations, as the Mount Washington Transit Tunnel lacks stations.

Though proposals for a rapid transit tunnel under 3rd Avenue date back to the 1910s and 1920s, planning for the modern bus and rail Metro Bus Tunnel only began in 1974. The King County Metro Council approved the bus tunnel proposal in November 1983, but construction did not begin until March 1987. The tunnel between Convention Place and Westlake stations was built using the cut-and-cover method, closing Pine Street for 19 months and disrupting nearby retail businesses. The segment from Westlake to the International District was bored with two tunnel-boring machines, heading north from Union Station and finishing within a month of each other. Tests of normal buses and the Breda dual-mode buses built specifically for tunnel routes began in March 1989, with tunnel construction declared complete in June 1990, at a cost of $455 million. Light rail tracks were installed in anticipation of future rapid transit service through the tunnel, later found to be poorly insulated and unusable for Link Light Rail. Soft openings of the five tunnel stations were held from August 1989 to September 1990, with regular bus service beginning on September 15, carrying 28,000 daily trips in its first year of operation.

The tunnel was closed on September 24, 2005 for modification to accommodate both buses and Sound Transit's Central Link light rail trains on a shared alignment. Prior to closure, around two dozen bus routes ran through the tunnel. The buses were dual-powered, operating as trolleybuses in the tunnel using electricity from overhead wires and as diesel buses on city streets. It reopened on Monday, September 24, 2007.[5] The two-year closure included retrofits for light rail and other operating system upgrades. A stub tunnel, branching from the main tunnel, was constructed under Pine Street between 7th and Boren Avenues to allow light rail trains to stop and reverse direction and for a later extension of Central Link that opened in 2016.[6]

Due to the conversion to light rail, dual-mode trolleybuses can no longer operate in the tunnel. Those buses have already been replaced by Metro's current new fleet of hybrid buses, which produce fewer emissions than standard diesel buses, and, unlike the trolleybuses, require no connection to overhead wires.[7]

Since the floor of the tunnel was lowered for the light rail, bus mirrors are now at head height, and there have been concerns that they may strike passengers waiting on the platform. To prevent this, the mirror on the platform side of the bus are equipped with flashing lights and the speed limit in stations has been lowered from 15 to 10 mph (24 to 16 km/h).[8]

Route

Station signage outside an entrance to Westlake station at the Macy's department store on Pine Street

The 1.3-mile-long (2.1 km), 18-foot-diameter (5.5 m)[9] twin tunnels serve the Central Link light rail line, which uses the tunnel between Westlake and International District/Chinatown stations,[10] and seven bus routes for King County Metro and Sound Transit Express, which run between Convention Place station and International District/Chinatown station.[11] Entrances at the three middle stations are built into nearby buildings and with variable-message signs over the stairs and elevators leading to the mezzanines. There are a total of 11 wheelchair-accessible elevators to the tunnel stations, as mandated by the Title II of the Americans with Disabilities Act and the United States Department of Transportation.[12][13] As part of the city's public art program that began in 1973, the Downtown Seattle Transit Tunnel and its stations were furnished with $1.5 million in artwork from 25 artists commissioned by King County Metro.[14][15] All tunnel stations, excluding Convention Place, are 60 feet (18 m) below street level and consist of two side platforms, two pickup lanes, and a passing lane in the middle.

Aerial view of Convention Place station, the northern terminus of the tunnel and the only station not served by Link Light Rail.

The northern portal, accessible to buses at street level from Olive Way and from Interstate 5 via an express lane ramp, is Convention Place Station at the intersection of 9th Avenue and Pine Street near the Washington State Convention Center. Convention Place is the only bus-exclusive station in the tunnel and consists of four sheltered platform in a sunken, open-air layover space below street level.[16] Buses enter the tunnel under 9th Avenue, passing under the historic Camlin Hotel before joining the University Link Tunnel, used by light rail trains headed north to Capitol Hill station, for three blocks under Pine Street.[17][18]

The DSTT enters Westlake station under Pine Street between 3rd and 6th avenues, located between the Westlake Center shopping mall and Westlake Park. The station features a two-block-long mezzanine with exits to Pine Street and several retailers, including the Westlake Center, Macy's in the former The Bon Marché flagship, and the headquarters of Nordstrom, as well as the King County Metro customer service center.[19] The area around the station is known as the Westlake Hub, with connections to the South Lake Union Streetcar and Seattle Center Monorail in addition to King County Metro and Sound Transit buses.[20] Leaving Westlake Station, the tunnel turns south under Century Square to follow 3rd Avenue and its transit mall through the central business district, parallel to the shoreline of Elliott Bay.[18]

Three blocks south of Pine Street, buses and trains enter University Street station, located between Union and Seneca streets adjacent to Benaroya Hall and 1201 Third Avenue in the financial district. The station has a split mezzanine, with entrances to 2nd Avenue and University Street accessible from the north half, and an entrance to Seneca Street from the south half.[21] From University Street, the tunnel continues under 3rd Avenue for five blocks, entering the Pioneer Square neighborhood and historic district. At this point, 3rd Avenue passes several of Seattle's skyscrapers, including the historic Seattle Tower, Safeco Plaza, Fourth and Madison Building and Wells Fargo Center.[18] Within University Street station, the tunnel passes over the century-old Great Northern Tunnel with a clearance of 15 feet (5 m).[22]

Pioneer Square station is located between Cherry Street and Yesler Way, with four entrances to nearby streets and Prefontaine Place serving two mezzanines. The station serves the administrative centers of the Seattle and King County governments, located within walking distance of Seattle City Hall, the Seattle Municipal Tower, the King County Courthouse and the King County Administration Building, as well as other major buildings, including Smith Tower, Columbia Center and Alaska Building.[23] The Seattle Civic Square project at the northeast side of the station will include integrated entrances from the intersection of 3rd Avenues and James Street,[24] but has been on hold since 2009.[25] From Pioneer Square, the tunnel travels down a 5.5% grade to cross 4.5 feet (1.4 m) under the Great Northern Tunnel at a 45-degree angle near the intersection of 4th Avenue South and South Washington Street, briefly descending below sea level,[26] before turning cardinal south into the International District neighborhood.[18][22][27]

The southernmost tunnel station, International District/Chinatown station, is partially open-air and located immediately below a public plaza at Union Station. The station has connections to Amtrak and Sounder commuter rail at King Street Station a block to the west, accessible through the Weller Street Bridge, as well as the First Hill Streetcar on Jackson Street, stopping east of 5th Avenue South.[28][29] Other nearby attractions to the station include CenturyLink Field to the west and Uwajimaya a block southeast.[18][30] South of the station, the light rail tracks and bus lanes are separated by railway signals at an underground bus layover and staging area adjacent to the tunnel comfort room for bus drivers. The southern portal of the tunnel is located under the intersection of Airport Way and 5th Avenue South at the western terminus of the Interstate 90 express lanes for high-occupancy vehicles.[31] Light rail trains and southbound buses continue from the tunnel in separated lanes on the SODO Busway, while eastbound buses use a ramp that merges with the Interstate 90 express lanes that will be retrofitted for East Link light rail service in 2023.[32]

Service

The Downtown Seattle Transit Tunnel is part of the "Third Avenue Transit Spine", the busiest transit corridor in Seattle, serving a combined average of 54,000 weekday riders with bus stops on the surface.[33] The tunnel has a theoretical capacity of 40 trains per hour per direction with a minimum of 90-second headways, carrying 22,000 passengers per hour per direction,[34] but is only able to carry 12,000 per hour per direction in 4-car light rail vehicles with current systems in place.[35] Prior to the start of Link light rail service, the DSTT could serve up to 145 buses during the afternoon rush hour.[36] As of 2012, the DSTT carries 52,600 daily riders, of which 10,000 are on light rail.[37] The tunnel carries a segment of the Central Link light rail line, which runs from University of Washington through Downtown Seattle and the Rainier Valley to Seattle–Tacoma International Airport. Trains serve all downtown tunnel stations, excluding Convention Place station,[16] 20 hours a day every day; during regular weekday service, trains operate roughly every 6 to 10 minutes during rush hour and midday operation, respectively, with longer headways of 15 minutes in the early morning and 20 minutes at night. During weekends, Central Link trains arrive every 10 minutes during midday hours and every 15 minutes during mornings and evenings. Light rail service from Westlake to International District/Chinatown takes approximately 7 minutes.[10][38]

As of September 2016, the DSTT is served by seven bus routes, stopping at all five tunnel stations. At each station, bus routes are divided into three bays labeled with their general direction. Bay A is served by three routes heading north toward Northgate and the University District and east to Kirkland via State Route 520; Bay C is served by three routes heading south through the SODO Busway toward the Rainier Valley and Renton; and Bay D is served by a single route, Sound Transit Express route 550, heading east to Mercer Island and Bellevue via Interstate 90.[39][40] Since June 2012, inbound buses have been allowed to drop off and pick up passengers at the front end of the platform, enabled after the elimination of the Ride Free Area to speed up boarding times.[41]

During closures of the Downtown Seattle Transit Tunnel, tunnel buses are rerouted onto 2nd and 4th avenues between Yesler Way and Pine Street, and Stewart Street and Olive Way between 2nd and Boren avenues. Metro also runs a special route, the Route 97 Link Shuttle, between all Link Light Rail stations during service disruptions.[42]

Operations

The DSTT is open for 20 hours on weekdays and Saturdays, from 5:00 am to 1:00 am the following day, and for 18 hours on Sundays, from 6:00 am to midnight.[11] At the time of its opening in 1990, the Metro Bus Tunnel only operated from 5:00 am to 7:00 pm on weekdays and 10:00 am to 6:00 pm on Saturdays, with no Sunday service;[43] the operating hours were temporarily extended into weekday nights from 1998 to 2000 at the request of the Seattle Seahawks and Seattle Mariners,[44] but were cut after the passage of Initiative 695 and subsequent loss of motor vehicle excise tax revenue.[45] Preparations for Link Light Rail service restored late-night and full weekend hours for the tunnel, introduced in June 2009 after Sound Transit Express route 550 moved all of its trips into the tunnel.[46]

Coordination between buses and trains in the tunnel is managed by the Link Light Rail Operations Control Center (OCC), located at the King County Metro Communication and Control Center in SoDo. The OCC controls vehicle separation between buses and trains by using on-board radio-frequency identification tags installed on tunnel buses and light rail vehicles, with their locations tracked by passing over induction loops embedded in the tunnel roadway. Railway signals at each station indicate when a bus driver can proceed through the tunnel.[47] Within the DSTT, bus speed limits are set at 15 miles per hour (24 km/h) in stations and staging areas and 30 miles per hour (48 km/h) between stations.[48]

King County Metro and Sound Transit, the joint operators of the tunnel, use two types of vehicles in the Downtown Seattle Transit Tunnel: Kinkisharyo-Mitsui light rail vehicles and New Flyer diesel-electric hybrid buses.[49] The buses, dubbed "tunnel buses" by King County Metro, were ordered in 2004 to replace a fleet of Breda dual-mode electric trolleybuses whose overhead wire was to be removed in the tunnel's renovation for light rail;[50] 59 of the Breda trolleybuses were converted into fully electric trolleybuses in 2007 and moved to surface routes, with full retirement scheduled after their replacement fleet is put into service in 2015.[51][52] The New Flyer low-floor, 61-foot-long (19 m) articulated buses feature a "hush mode" that allows buses to operate solely on stored electric power within the tunnel, minimizing emissions and noise.[53]

History

Previous subway proposals

Several proposals for a cut-and-cover subway tunnel under 3rd Avenue in Downtown Seattle were presented to the City of Seattle by predecessors of the Seattle Planning Commission throughout the 20th century. The first major proposal was part of Virgil Bogue's "Plan for Seattle" in 1911 as Route 1 of his rapid transit network. Route 1 ran southeast on 3rd Avenue from a circular ring around a proposed civic center in the Denny Regrade neighborhood to King Street Station, paralleled to the west by a subway on 1st Avenue known as Route 17; stations on the line would have additional entrances from department stores and other major businesses on 3rd Avenue.[54][55] The plan was supported by City Engineer Reginald H. Thomson and the Municipal League among others, while opposed by businesses fearing it would shift the commercial district further north and by the three daily newspapers published in Seattle. A special municipal election for the comprehensive plan was held on March 5, 1912, in which Seattle voters rejected it by a 10,000-vote margin.[56][57][58]

Although Bogue's proposal was ultimately rejected, some elements of the plan were independently studied by others, including a rapid transit subway in Downtown Seattle. In 1920, City Engineer Arthur H. Dimmock published a report recommending a rapid transit system for the city of Seattle, centered around a cut-and-cover subway tunnel under 3rd Avenue from Virginia Street to Yesler Way. The line would be connected to surface and elevated lines at Dexter Avenue, Olive Way and South Jackson Street, serving the neighborhoods of Fremont, Eastlake, Capitol Hill, and North Delridge in West Seattle.[59][60] The proposal, which was expected to not be acted upon for at least 15 years, gained little support and was called a project of "purely academic interest" by Mayor Hugh M. Caldwell, who doubted that any rapid transit proposal would be seriously considered during his term.[61] The Seattle City Planning Commission proposed its own rapid transit system in 1926, centered on an elevated line over Western Avenue with a possible parallel subway under 3rd Avenue from Yesler Way to Pike Street.[62] The Seattle Traffic Research Commission published a report in 1928 recommending a subway under 2nd Avenue from King Street Station to Pike Street as part of a longer rapid transit line serving the University District and Fremont.[63] In the late 1950s, the Seattle Transit Commission proposed building a rapid transit system on the existing right-of-way used by Interstate 5 between Tacoma, Seattle and Everett, with a two-station subway under 5th Avenue in Downtown Seattle.[64]

The most significant rapid transit proposal came as part of the Forward Thrust initiatives of the late 1960s, which was centered around a downtown subway under 3rd Avenue. The subway was to be fed by lines from Ballard, Lake City, the University District, Capitol Hill, Bellevue, and Renton, combining for a planned minimum headway of 1.5 minutes at rush hour, 2.5 minutes during midday, and 5 minutes all other times.[65] The stations on 3rd Avenue were to be situated at South Jackson Street and 5th Avenue South, James and Cherry streets, Seneca and Spring streets, and Pike and Pine streets, all planned to open by 1985 and operated by the Municipality of Metropolitan Seattle.[66] Seattle voters were asked to provide $385 million, to supplement a $765 million grant from the Urban Mass Transportation Administration (UMTA), during a municipal election on February 13, 1968, narrowly passing the bond by 50.8%, but falling short of the required 60% supermajority.[67] A second attempt on May 19, 1970, with an adjusted $440 million local contribution and $881 million federal grant, failed to pass with only 46% approval amid a local recession caused by layoffs at Boeing; the earmarked funds intended for the Forward Thrust rapid transit project were instead allocated to Atlanta, Georgia to build their rapid transit system.[68]

Bus tunnel proposal and approval

The concept of a downtown bus tunnel was first proposed in 1974 during discussions between Governor Dan Evans and Seattle Mayor Wes Uhlman regarding regional transportation projects in response to the proposed extension of Interstate 90 into Seattle via a third floating bridge crossing Lake Washington.[69] Metro Transit later commissioned a study into the bus tunnel,[70] released the following July, which determined that it would not be able to adequately meet the rush hour demand of downtown bus ridership by 1980. The study suggested that a double-decked tunnel with automated guideway transit to complement bus service, running from Union Station to the Seattle Center, would be able to meet projected demand at an estimated cost of $450 million.[71] Ultimately, the plan was rejected because of the high cost of ventilation for diesel buses that would use the tunnel.[72] The bus tunnel proposal resurfaced in 1979, outlining a tunnel from South Jackson Street to Pine Street that would carry 200 buses an hour in each direction at a cost of up to $350 million with the option of conversion for electric rail transit in the future. It was suggested by Metro officials and engineering consultants Parsons Brinckerhoff as part of a series of proposals from a task force on studying solutions to downtown traffic were unable to find suitable alternatives.[72] The proposal gained further support from Metro Transit in their long-term "Metro 1990" plan, adopted in 1981, in which a transit mall or tunnel under 3rd Avenue carrying buses to be converted for a light rail system was suggested by the Puget Sound Council of Governments (PSCOG).[73]

Service in the tunnel was originally provided by dual-mode buses, which operated as trolleybuses when underground. Bus 5096 is pictured at Westlake station in 1990.

The Metro Transit Committee debated the inclusion of the bus tunnel in the environmental impact assessment of the Downtown Seattle Transit Project well into 1983, with Seattle members opposing the tunnel in favor of a transit mall and suburban members supporting a bus tunnel that would be converted to a light rail system connecting Seattle to Snohomish County proposed by the PSCOG.[74][75][76] On September 22, the UMTA requested that a preferred alternative be declared by the end of November, which prompted the Metro Council to expedite their decision. Metro Council Executive Director Neil Peterson favored the tunnel alternative, while the Seattle City Council and Mayor Charles Royer preferred a car-free street mall but stated that a tunnel would be a long-term solution to downtown congestion.[77] The Seattle City Council reversed its decision on their preferred alternative, voting unanimously on October 17 in favor of an electric-only transit tunnel but were willing to compromise, along with Mayor Royer, on Peterson's proposed dual-mode buses to serve suburban commuters where trolleybuses aren't feasible.[78] The Metro Council approved the downtown bus tunnel by a unanimous vote on November 3, 1983, estimating a cost of $300 million to build a five-station tunnel under 3rd Avenue and Pine Street to be completed in 1989 along with the conversion of 3rd Avenue into a landscaped transit mall.[79]

Planning, funding and design

Metro unveiled its tentative plans for the bus tunnel in January 1984, selecting five sites for stations along 3rd Avenue and Pine Street: at Union Station, the King County Courthouse, between Seneca and Union streets, at the Westlake Mall, and near the Washington State Convention Center. The Burlington Northern Railroad opposed Metro's preference for the tunnel to cross the existing Great Northern Tunnel by going under it, with the agency stating that passing over would require a cut-and-cover tunnel that would disrupt City Hall Park.[80] The following month, Metro announced that it would use a fleet of 200 dual-mode buses for the first decade of tunnel operations, with an eventual switch to subway trains. The bored tunnel would be able to carry 180 buses an hour in each direction, serving either a wide island platform or two smaller side platforms that would be dug out from the surface.[81][82] In April, Metro published the draft environmental impact statement for the tunnel project, estimating a cost of $387 million (equivalent to $883 million in 2016)[83] and a completion date of June 1989.[84] The cost of the project drew criticism at public hearings for using a significant portion of Metro's capital budget, a total of $840 million from sales tax revenue approved by voters in 1980, as well as potential disruption to business during the cut-and-cover construction of the stations and Pine Street segment of the tunnel.[85][86]

The UMTA ranked Metro's bus tunnel project as first among transit projects favored to receive federal funding in 1985, despite its reliance on unproven dual-mode buses. Metro tested a prototype Renault PER 180 dual-mode trolleybus in 1983, describing it as problematic after finding it exceeded freeway axle load limits by 2 short tons (1.8 t) and having to replace several parts after several mechanical failures.[87] Congress later appropriated $20 million to the City of Seattle for the bus tunnel project in October 1984, allowing for right-of-way acquisition to begin,[88] but the funds were withheld until restrictions on new transit projects were lifted by the United States Senate the following May.[89]

The Downtown Transit Project subcommittee unanimously approved Metro recommendations that would reduce the number of bus tunnel stations from six to five, saving $35 million, as well as opting for tunnel boring machines for the 3rd Avenue segment to minimize surface-level disruptions that would be present from cut-and-cover excavation.[90] Stations would be located at Union Station south of Jackson Street, under 3rd Avenue and James Street, under 3rd Avenue and University Street, at the Westlake Mall and at 9th Avenue and Pine Street near the Washington State Convention Center.[91] The Metro Council approved the station sites and use of tunnel-boring machines in July 1985, proceeding with final design by approving a $25.9 million contract with Parsons Brinckerhoff for engineering work related to the project.[92][93]

In March 1986, the federal government offered Metro a contract committing $195 million in UMTA funding toward the bus tunnel, requiring a decision on whether to move forward with the project due by December 31.[94] A month later, the King County Council asked Metro to consider delaying construction on the bus tunnel while waiting for assurance on federal funding being able to cover half of the $395 million cost of the project; the council was scheduled to begin awarding contracts for utility relocation along 3rd Avenue and Pine Street in preparation for tunnel construction.[95] On May 15, the Reagan administration signed a contract with Metro to commit $197 million of the $395 million required for the bus tunnel project, assuming re-authorization of a mass transit grant program by Congress, while also extending the deadline for a final decision to September 1987.[96] Hours later, the Metro Council awarded the first construction contract for utility relocation with construction set to begin in July.[97] The Metro Council accepted the UMTA contract during their June 5 meeting, allowing for bidding on tunnel construction to begin.[98] The tunnel construction contract was awarded to the joint venture of Guy F. Atkinson Construction and Dillingham Construction in late September for $44.16 million, beating seven competing bids with an estimate far lower than the expected $61 million expected by Metro engineers.[99][100] The contract for the controversial dual-mode trolleybuses was awarded by the Metro Council to Breda Costruzioni Ferroviarie in October, consisting of an order of 236 buses at a cost of $133 million,[101] and it was later approved by the UMTA in November.[102]

Construction

Construction on the bus tunnel project began with partial closures of 3rd Avenue in July 1986 for utility relocation, narrowing traffic to one lane in either direction and restricting traffic to buses and emergency vehicles during rush hour;[103] to prepare for extended periods of service disruption on 3rd Avenue, King County Metro also moved its electric trolleybus routes onto 1st Avenue.[104]

Excavation of the 3rd Avenue tunnel segment began with the ceremonial launch of the "Mighty Mole", a 140-short-ton (130 t), 129-foot-long (39 m) tunnel boring machine (TBM), on March 6, 1987.[105][106] The TBM, designed by Robbins Company of Kent and built by Nicholson Manufacturing in Seattle, began digging the western tunnel from Union Station the following May.[107] A second, identical "Mighty Mole" TBM began digging the parallel eastern tunnel on June 29.[108] During tunnel boring under 3rd Avenue between Spring Street and Madison Street on October 21, a small earthflow damaged a water main and caused pavement on 3rd Avenue to drop 8 inches (20 cm), shutting down water in the nearby Seattle City Light and 1001 Fourth Avenue Plaza buildings;[109] while repairing the broken water main, electricians working on damaged high-voltage cables caused a small power outage that affected eight downtown buildings on the night of October 28, but were able to restore power by the following morning.[110] Work on the western tunnel was briefly interrupted in November, when the TBM hit an unexpectedly large pocket of loose sand under Madison Street that had to be stabilized with grout to prevent damage to the adjacent Seattle City Light building.[111] Boring on both tunnels was stopped in early January 1988, when a pocket of wet sand was encountered 300 feet (91 m) before the planned 90-degree turn onto Pine Street.[112] Metro and tunnel contractors Atkinson/Dillingham, who had scheduled tunnel excavation to have been completed in mid-January, closed 3rd Avenue between Pike and Pine streets and installed 40 drilled wells to remove water from the sand pocket in February.[113] Digging resumed on the western tunnel on March 14,[114] and the TBM reached Westlake station on April 9, completing the first of the two tunnels.[115] The eastern tunnel was completed a month later on May 18, allowing for parts of the TBMs to be salvaged and the steel outer shells to be buried in the tunnel.[116]

The Pine Street segment of the tunnel was planned to be dug cut-and-cover from the surface to a depth of 60 feet (18 m) instead of using TBMs similar to those used on 3rd Avenue. In preparation for utility relocation work on Pine Street, Metro moved 36 bus routes serving the corridor to other east–west streets in February 1987.[117] Excavation of the tunnel began with the closure of Pine Street, and its offramp to I-5, to automobile traffic between 3rd Avenue and Boren Avenue on April 27.[118] Workers finished digging in late August, allowing the project to progress to concrete pouring for the roadway.[119] Pine Street was briefly re-opened for the Christmas shopping season beginning November 2 at the request of downtown merchants, with a temporary surface laid over backfill for automobiles and pedestrians.[120] The street was closed to automobile traffic once again, along with the intersection of 5th Avenue and Pine Street and the Pike Street offramp of I-5, on January 4 to install utility lines and a permanent roadway.[121] Pine Street was fully reopened to traffic on November 1, 1988, coinciding with the completion of Westlake Park and Westlake Center, a year ahead of schedule.[122]

By October 1988, Metro reported that 53% of major construction was complete and anticipated that the tunnel would be completed in May 1990 and opened for service in September 1990.[123] Mayor Norm Rice and Seattle City Council members Paul Kraabel and George Benson recommended a limited opening of the tunnel for the 1990 Goodwill Games to be held in July,[124] but Metro rejected the proposal in order to adequately test the safety systems of the tunnel before service began.[125] Testing in the bus tunnel began with a ceremonial first run on March 15, 1989, with a 40-foot (12 m) bus and one of the Breda dual-mode trolleybuses towed over a temporary road surface. By January 1990, the tunnel stations were declared "nearly complete", only with minor work left to complete.[126] Murals and other interactive art installations were placed in the nearly complete stations from December 1989 onwards, as part of a $1.5 million arts program.[127] Tunnel construction was declared complete on June 7, 1990, leaving Metro to test safety systems and train personnel for regular service to begin in September.[128]

The initial cost of the tunnel project was estimated in 1984 to be $334.6 million, but the final costs rose 56% overbudget to a total of $468.7 million;[129][130] the project's cost overruns were blamed on unanticipated soil conditions on the approach to Pine Street from 3rd Avenue, complaints and payouts to downtown businesses disrupted by tunnel construction and the death of an electrician during construction.[105]

South African granite scandal

A minor scandal involving the bus tunnel project emerged in late 1988 with the discovery that granite to be received by Metro for the stations had been sourced from South Africa. The Verde Fontaine granite was quarried in South Africa, which had been under Apartheid rule at the time, but was cut and finished in Italy, allowing for it to be approved despite the Metro Council's ongoing boycott of South African goods.[131][132]

Prior to the discovery, African-American rights groups forced tunnel contractor Atkinson/Dillingham to return 36 steel beams from South Africa, used for temporary shoring at Pioneer Square station, in September 1987. This led Metro Director Alan Gibbs to propose a ban on South African materials by Metro for its projects, which was adopted by a resolution of the Metro Council on September 17.[133][134]

In late 1988, Eddie Rye Jr. of the Black Contractors Coalition notified Metro that granite originated in South Africa, but it was found that the stone did not technically violate the Metro Council ban passed in 1987. The Verde Fontaine granite was selected for use as benches and interior walls in Westlake and Pioneer Square stations by architecture firm TRA; Metro was not aware that Verde Fontaine was only quarried in South Africa. In response, Metro Director Alan Gibbs estimated that replacing the 24,000 square feet (2,200 m2) of granite would cost $500,000 and delay both stations, but would not affect the overall budget or anticipated beginning of service in 1990.[135]

Metro Director Alan Gibbs confirmed that the granite was quarried in South Africa during a press conference on January 25, 1989, while preparing an investigative report for the Metro Council Transit Committee scheduled for February 2.[136] The announcement was met with calls from King County Councilman Ron Sims to fire the responsible Metro officials who knowingly allowed the purchase to go through.[137] Metro's ban on South African goods was stricter than the federal sanctions, which only prohibited importation of specific materials such as steel, coal, uranium and agricultural products, and was used by the Urban Mass Transit Administration to threaten to pull its funding for the bus tunnel project.[138]

A report by the Metro Council Rules Committee delivered in March stated that the granite's origin was discovered in the spring of 1988 and was authorized by tunnel superintendent David Kalberer with the assumption that only a small amount would be used to furnish University Street station;[139] Kalberer, who received praise for his work on the project prior to the scandal, admitted that the failure to consult the Metro Council's tunnel subcommittee before signing off on the deal was his mistake.[140] Metro Director Alan Gibbs resigned on February 23 as a result of the scandal and was succeeded by technical director Richard Sandaas in September.[141][142]

Opening

Regular service in the bus tunnel began on September 15, 1990.[1][43]

References

  1. 1 2 Crowley, Walt (October 1, 2000). "Bus service begins in downtown Seattle transit tunnel on September 15, 1990.". HistoryLink. Retrieved September 30, 2014.
  2. Middleton, William D. (April 1, 2006). "Sound Transit builds for LRT: Projected growth over the next 25 years is driving the Seattle region's rapid push to expand light rail.". Railway Age. Chicago, Illinois: Simmons-Boardman Publishing: 43–45. OCLC 1586268. Retrieved September 30, 2014.
  3. "Council Agrees to Joint Operation of Transit Tunnel". 2003-02-06. Archived from the original on 2005-02-11.
  4. "Seattle bus tunnel set to reopen". KOMO News. 2007-09-18. Retrieved 2016-07-22.
  5. "Pine Street Stub Tunnel". Sound Transit. Retrieved 2009-05-30.
  6. "Downtown Seattle Transit Tunnel and Changing Bus Technology". King County Metro. 2007-12-14. Retrieved 2009-05-30.
  7. Brown, Charles E. (2007-09-28). "The Bumper Connection: Tunnel Vision". The Seattle Times. Retrieved 2009-05-30.
  8. Crowley, Walt (January 1, 2000). "Workers complete primary excavation of downtown Seattle transit tunnel on April 8, 1988.". HistoryLink. Retrieved September 30, 2014.
  9. 1 2 "Link light rail schedule". Sound Transit. September 10, 2016. Retrieved September 11, 2016.
  10. 1 2 "Downtown Seattle Transit Tunnel". King County Metro. Retrieved September 11, 2016.
  11. Downtown Seattle Accessible Map and Transit Guide (PDF) (Map). King County Metro, Sound Transit. Retrieved September 30, 2014.
  12. Gilje, Shelby (September 27, 1990). "Looking Out For Rights Of The Disabled". The Seattle Times. Retrieved April 25, 2015.
  13. "Take time to experience the art of bus riding". King County Metro. Retrieved September 30, 2014.
  14. Mathieson, Karen (September 12, 1990). "Tunnel Visions -- Bus Labyrinth Beneath Seattle Spawns Gallery". The Seattle Times. Retrieved September 30, 2014.
  15. 1 2 Transit Tunnel: Convention Place Station (PDF) (Map). King County Metro Transit. September 2007. Retrieved September 30, 2014.
  16. "Pine Street Stub Tunnel" (PDF). Sound Transit. November 30, 2012. Retrieved September 30, 2014.
  17. 1 2 3 4 5 Downtown Seattle Transit Tunnel (PDF) (Map). King County Metro Transit. Retrieved September 30, 2014.
  18. "Metro Customer Services". King County Metro. January 1, 2013. Retrieved September 30, 2014.
  19. Transit Tunnel: Westlake Station (PDF) (Map). King County Metro Transit. September 2007. Retrieved September 30, 2014.
  20. Transit Tunnel: University Street Station (PDF) (Map). King County Metro Transit. September 2007. Retrieved September 30, 2014.
  21. 1 2 Mapes, Lynda V. (December 10, 2011). "Tunnels: Seattle's boring past filled with thrills". The Seattle Times. Retrieved September 30, 2014.
  22. Transit Tunnel: Pioneer Square Station (PDF) (Map). King County Metro Transit. September 2007. Retrieved September 30, 2014.
  23. Finance & Administrative Services. "Civic Square". City of Seattle. Retrieved July 7, 2015.
  24. "2 towers long on ice show signs of thaw". The Seattle Times. February 9, 2013. Retrieved September 30, 2014.
  25. "Pioneer Square Station-the Pioneering Spirit". King County Metro. Retrieved January 2, 2015.
  26. Lane, Bob (September 14, 1987). "Mechanical Moles". The Seattle Times. p. D1. Retrieved September 30, 2014 via NewsBank. (subscription required (help)).
  27. Seattle Department of Transportation (July 2013). "Seattle Streetcar: First Hill Line" (PDF). Seattle Streetcar. Retrieved September 30, 2014.
  28. Lindblom, Mike (July 11, 2009). "International District/Chinatown Station is switching point for many commuters". The Seattle Times. Retrieved September 30, 2014.
  29. Transit Tunnel: International District/Chinatown Station (PDF) (Map). King County Metro Transit. September 2007. Retrieved September 30, 2014.
  30. I-90 Express Lanes Map (Map). Washington State Department of Transportation. Retrieved September 30, 2014.
  31. "East Link Light Rail Segment A: Seattle, Mercer Island via I-90" (PDF). Sound Transit. November 2010. p. 1. Retrieved September 30, 2014.
  32. "Third Avenue Transit Corridor Improvement and RapidRide Facilities Project Description Information" (PDF). Puget Sound Regional Council. 2012. Retrieved January 3, 2015.
  33. "Technical Appendix F: Capacity Calculations". Regional Transit Long-Range Plan Draft Supplemental Environmental Impact Statement (PDF) (Technical report). Sound Transit. December 2, 2004. p. F-3. Retrieved September 30, 2014.
  34. Lindblom, Mike (December 4, 2015). "Would voters dig another transit tunnel?". The Seattle Times. Retrieved December 7, 2015.
  35. "Chapter 3: Transportation Impacts and Mitigation" (PDF). North Link Final Supplemental Environmental Impact Statement (Report). Sound Transit. March 2006. Retrieved August 18, 2016.
  36. Limargo, Irin (August 1, 2012). "Operational Strategies to Prepare the Downtown Seattle Tunnel for Pay on Entry" (PDF). American Public Transportation Association. p. 6. Retrieved September 30, 2014.
  37. "Expanded Metro bus service coming; Link light rail ramps up in downtown tunnel" (Press release). King County Metro. September 16, 2015. Retrieved December 7, 2015.
  38. "Metro Transit Service Change: September 10, 2016". King County Metro. March 2016. Retrieved September 11, 2016.
  39. Downtown Metro Service: Frequent Routes to Help You Get Around Downtown (PDF) (Map). King County Metro. June 2014. Retrieved September 30, 2014.
  40. "Ride Free Area (discontinued Sept. 2012) Questions & Answers". King County Metro. Retrieved December 7, 2015.
  41. Surface Street Bus Stops When the Downtown Seattle Transit Tunnel is Closed (PDF) (Map). King County Metro. Retrieved September 30, 2014.
  42. 1 2 "Seattle Briefly: New Bus Schedules Effective Tomorrow". The Seattle Times. September 14, 1990. Retrieved September 30, 2014.
  43. Schaefer, David (May 29, 1998). "Bus-Tunnel Hours Extended To 11 P.M. - Fares To Go Up 15 Cents A Ride". The Seattle Times. p. B1. Retrieved September 30, 2014 via NewsBank. (subscription required (help)).
  44. Gilmore, Susan (June 2, 2002). "Bumper to Bumper: The story behind the gridlock". The Seattle Times. Retrieved September 30, 2014.
  45. "New trains, new bus trips bring big changes in June" (Press release). Seattle, Washington: Sound Transit. May 21, 2009. Retrieved September 30, 2014.
  46. Central Link Operations Plan: Initial Segment and Airport Link (PDF) (Report). Sound Transit. July 29, 2008. pp. 26–28. Retrieved September 30, 2014.
  47. Eckhardt, Katherine, ed. (June 7, 2011). "King County Metro Transit Operations Policies and Procedures #68: Downtown Seattle Transit Tunnel and SODO Busway Operations Procedure" (PDF). Amalgamated Transit Union Local 587. Retrieved September 30, 2014.
  48. "Link Light Rail Vehicle Statistics" (PDF). Sound Transit. December 2006. Retrieved September 30, 2014.
  49. "New Flyer Articulated Low Floor Hybrid Bus". Metro Vehicles. King County Metro. Retrieved August 16, 2015.
  50. "Breda Articulated Trolley Bus". Metro Vehicles. King County Metro. Retrieved September 30, 2014.
  51. "Metro to partner with New Flyer on next generation of electric trolley buses" (Press release). Seattle, Washington: King County Metro. June 17, 2013. Retrieved March 27, 2015.
  52. "Downtown Seattle Transit Tunnel and Changing Bus Technology". Metro Vehicles. King County Metro. Retrieved September 30, 2014.
  53. Bogue, Virgil (1911). "Appendix No. III—Proposed Rapid Transit System". Plan of Seattle: Report of the Municipal Plans Commission. Seattle, Washington: Lowman & Hanford. p. 180. OCLC 1440455. Retrieved August 16, 2015 via Google Books.
  54. "Municipal Plans Embrace Great Third Avenue Improvements". The Seattle Times. November 12, 1911. p. 25.
  55. McRoberts, Patrick (November 4, 1998). "Seattle defeats Bogue Improvement Plan on March 5, 1912.". HistoryLink. Retrieved August 16, 2015.
  56. Crowley, Walt (September 17, 1972). "Virgil Bogue's plan: Seattle that might have been". The Seattle Times. pp. 8–9.
  57. "Single Tax And City Paper Are Voted Down: All Bond Issues Receive Approval of People and Voters Decide to Have a Look at Plans for Municipal Telephone System.". The Seattle Times. March 6, 1912. p. 2.
  58. Dimmock, Arthur H.; Henderson, D. W.; Reeves, Carl H. (December 16, 1920). Report on Proposed Rapid Transit System for the City of Seattle. City of Seattle. OCLC 46418921.
  59. "2008 Find of the Month Archive: 1920 rapid transit plan". Seattle Municipal Archives. June 2008. Retrieved August 16, 2015.
  60. "Rapid Transit Sought; Plans Submitted to Members of City Council; Proposals for Seattle Would Cost Millions, Not Yet Officially Estimated". The Seattle Daily Times. December 21, 1920. p. 2.
  61. Trimble, William Pitt (1926). Seattle Rapid Transit Report to the City Planning Commission. Seattle Planning Commission. OCLC 14264109.
  62. Pollock, C. D.; Seattle Traffic Research Commission; Clearing House Association of Seattle (December 1928). Report of the Seattle Traffic Research Commission, 1928. Seattle Traffic Research Commission. p. 25. OCLC 11052336.
  63. Kennett, John J. (March 1, 1957). Rapid Transit on Freeway, Tacoma-Seattle-Everett. Seattle Transit. OCLC 13297486.
  64. De Leuw, Cather & Company (March 19, 1970). "Figure 7-2: Rapid Transit Average Travel Times and Assumed Headways" (Map). The Rapid Transit Plan for the Metropolitan Seattle Area: Technical Appendix. Municipality of Metropolitan Seattle. p. 7-33. OCLC 36627361 via Flickr.
  65. De Leuw, Cather & Company (February 19, 1970). "Chapter 1: Recommended Public Transportation Plan". The Rapid Transit Plan for the Metropolitan Seattle Area. Municipality of Metropolitan Seattle. p. 15. OCLC 120953.
  66. McRoberts, Patrick (January 1, 1999). "King County voters on Forward Thrust bonds approve stadium and aquarium and nix transit on February 13, 1968.". HistoryLink. Retrieved August 16, 2015.
  67. "Voters reject rail transit plan and three other Forward Thrust bond proposals on May 19, 1970.". HistoryLink. September 19, 2002. Retrieved August 16, 2015.
  68. Lane, Bob (December 19, 1974). "Downtown bus tunnel, third bridge in Evans-Uhlman plan". The Seattle Times. p. A1.
  69. "Metro Transit planning firm is hired". The Seattle Times. December 22, 1974. p. A11.
  70. "Study weighs solutions to busways jam". The Seattle Times. July 25, 1975. p. A6.
  71. 1 2 Lane, Bob (July 29, 1979). "Metro takes new look at bus tunnel". The Seattle Times. p. A22.
  72. Lane, Bob (March 22, 1981). "'Light rail' system might solve transit problems, says study". The Seattle Times. p. A16.
  73. Gough, William (June 3, 1983). "Bus-tunnel proposal debated by Metro committee". The Seattle Times. p. B6.
  74. Gough, William (June 10, 1983). "Debate on tunnel vs. transit mall continues". The Seattle Times. p. B2.
  75. Gough, William (December 5, 1982). "Rapid-transit system studied for Seattle, Snohomish County". The Seattle Times. p. B31.
  76. Gough, William (October 3, 1983). "Metro chief urges a city tunnel for electric buses". The Seattle Times. p. B1.
  77. Schaefer, David (October 18, 1983). "City Council would approve electric buses in downtown tunnel". The Seattle Times. p. B1.
  78. Gough, William (November 4, 1983). "Metro Council OK's downtown transit tunnel". The Seattle Times. p. B1.
  79. Nogaki, Sylvia; Gough, William (January 14, 1984). "Metro chooses bus-station sites, hits snag over downtown tunnel". The Seattle Times. p. A8.
  80. Gough, William (January 26, 1984). "Bus tunnel, transit plan would cost $400 million". The Seattle Times. p. C1.
  81. Nogaki, Sylvia (February 18, 1984). "Metro envisions city bus subway in 5 years". The Seattle Times. p. A6.
  82. Federal Reserve Bank of Minneapolis Community Development Project. "Consumer Price Index (estimate) 1800–". Federal Reserve Bank of Minneapolis. Retrieved October 21, 2016.
  83. Parker, Laura (April 15, 1984). "Underground: Metro wants bus tunnel". Seattle Post Intelligencer, The Seattle Times. pp. A26–A27.
  84. Nogaki, Sylvia (April 24, 1984). "Hearing to study downtown bus tunnel". The Seattle Times. p. B1.
  85. Nogaki, Sylvia (April 26, 1984). "Metro's plan for buses draws fire". The Seattle Times. p. B1.
  86. Nogaki, Sylvia (May 18, 1984). "Metro project gets edge for federal funding". The Seattle Times. pp. A1, A12.
  87. "Seattle wins $20 million for building downtown bus tunnel". The Seattle Times. United Press International. October 12, 1984. p. B5.
  88. Anderson, Ross (May 15, 1985). "Federal Funds To Be Freed For Bus Tunnel". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  89. Nogaki, Sylvia (September 13, 1984). "Panel urges boring of Metro tunnel — and 5 stations". The Seattle Times. p. B2.
  90. "Panel picks sites for tunnel stations". The Seattle Times. November 1, 1984. p. C6.
  91. "Metro OK's Contract For Design For Bus Tunnel". The Seattle Times. July 19, 1985. p. B5. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  92. Lane, Bob (August 30, 1985). "Metro Driving Forward With Tunnel". The Seattle Times. p. B2. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  93. Lane, Bob (March 21, 1986). "Metro Ironing Out Bus-Tunnel Contract". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  94. Lane, Bob (April 3, 1986). "Metro Asked To Study Bus-Tunnel Delay". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  95. Pryne, Eric (May 15, 1986). "Administration Gives Metro 'Full-Funding' Contract For Bus Tunnel". The Seattle Times. p. A9. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  96. Lane, Bob (May 16, 1986). "Metro Awards Bus-Tunnel Contract - Go-Ahead Given After U.S. Agrees to Assist". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  97. Gilmore, Susan (June 6, 1986). "$23.6 Million Freed For Transit Tunnel - 'Full-Funding Contract' OK'd". The Seattle Times. p. B4. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  98. "Around the Sound: First contract given for Metro's bus tunnel". The Seattle Times. September 19, 1986. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  99. "Bus-Tunnel Bid So Low That Engineers Gasp". The Seattle Times. September 12, 1986. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  100. Lane, Bob (October 25, 1986). "Italian Company Submits Low Bid To Build 236 Metro 'Tunnel Buses'". The Seattle Times. p. D8. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  101. Lane, Bob (November 3, 1986). "Metro Gets OK To Buy Italian-Made Buses". The Seattle Times. p. B12. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  102. Gilje, Shelby (July 11, 1986). "Third Avenue Work Disrupts Mail". The Seattle Times. p. E5. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  103. Updike, Robin (January 27, 1987). "Downtown Merchants Move, Add Promotion Tax In Their Efforts To Survive City's New Construction". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  104. 1 2 Crowley, Walt (October 1, 2000). "Metro Transit begins excavating downtown Seattle transit tunnel on March 6, 1987.". HistoryLink. Retrieved April 17, 2011.
  105. Lane, Bob (March 2, 1987). "'Mighty Mole' Is A Giant Pest - Metro Tunnel Is Headache For Merchants". The Seattle Times. p. B1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  106. Lane, Bob (May 15, 1987). "Big 'Mole' To Gnaw Through Downtown - Exotic White Machine Displayed, Christened". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  107. Lane, Bob (June 26, 1987). "'Mole' Is Burrowing Bus Tunnel - 140-Ton 'Creature' Digging Its Way Under Downtown". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  108. Blater, Joni (October 21, 1987). "Water Taps Run Dry On Third Avenue". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  109. "Seattle Briefly: Power restored to 8 downtown buildings". The Seattle Times. October 27, 1987. p. D1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  110. Lane, Bob (November 6, 1987). "Loose Sand Delays Work On Bus Tunnel". The Seattle Times. p. B2. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  111. Lane, Bob (January 20, 1988). "Ice Age Sand Trap Halts Machine Age Bus-Tunnel Project". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  112. Lane, Bob (January 23, 1988). "Extraction of water may delay bus tunnel digging 6-8 weeks". The Seattle Times. p. A8. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  113. Lott, Jimi (March 14, 1988). "Looking Over The Down Under". The Seattle Times. p. B1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  114. "One Bus-Tunnel Tube Excavated". The Seattle Times. April 9, 1988. p. C16. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  115. Lane, Bob (May 18, 1988). "Light At The End Of Metro's Tunnel - Breakthrough Day Downtown for Seattle's Mighty Mole". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  116. Lane, Bob (February 3, 1987). "Big Dig Will Close Pine St. To Buses". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  117. Lane, Bob (April 25, 1987). "Pine Street In Downtown Area To Be Off Limits To Most Traffic - Tunnel Construction Forces Closure For At Least A Year". The Seattle Times. p. A8. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  118. Lane, Bob (August 25, 1987). "Pouring Begins: Thick Concrete For Tunnel Beneath Pine Street". The Seattle Times. p. C3. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  119. Lane, Bob (November 2, 1987). "Pine St. Reopens - For The Shoppers". The Seattle Times. p. B3. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  120. Lane, Bob (December 31, 1987). "Jackhammers Will Take Over Pine Street Again". The Seattle Times. p. E3. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  121. "Northwest Briefly: Ramp, Street Opening To Help Speed Traffic". The Seattle Times. November 1, 1988. p. B2. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  122. Lane, Bob (October 8, 1988). "Tunnel Job Going Out Of Sight - 'Sidewalk Superintendents' Losing View". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  123. Lane, Bob (January 21, 1990). "Safety Officials Oppose Opening Tunnel For Games". The Seattle Times. Retrieved August 16, 2015.
  124. "Games Here Too Soon For Tunnel, Says Staff". The Seattle Times. February 15, 1990. Retrieved August 16, 2015.
  125. "End Is Near For Work On City's Bus Tunnel". The Seattle Times. January 2, 1990. Retrieved August 16, 2015.
  126. Lane, Bob (December 21, 1989). "Art Tunnel - Metro Installs Murals, Fancy Fixtures To Make Bus Stations A Visual Treat". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (subscription required (help)).
  127. Lane, Bob (June 7, 1990). "Deafening Silence: Bus Tunnel's Done". The Seattle Times. Retrieved August 16, 2015.
  128. Office of Planning and Environment (September 2007). "Appendix 1: Project Profiles". Contractor Performance Assessment Report (PDF) (Report). Federal Transit Administrtation. p. 156. Retrieved August 16, 2015.
  129. Gutierrez, Scott (October 17, 2009). "Report: Other Seattle-area tunnels have been over-budget". Seattle Post-Intelligencer. Retrieved August 16, 2015.
  130. Crowley, Walt (January 1, 2000). "Metro Director Alan Gibbs resigns on February 23, 1989, in scandal over use of South African granite in bus tunnel.". HistoryLink. Retrieved July 20, 2016.
  131. Williams, David B. (2000). The Seattle Street-Smart Naturalist: Field Notes from the City. Westwinds Press. ISBN 9781558688599.
  132. Lane, Bob (September 4, 1987). "Metro Bans South African Steel From Bus-Tunnel Project - Complaints From Officials, Black Groups". The Seattle Times. p. B2. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  133. Pryne, Eric (February 2, 1989). "Metro Staff Put Loophole Into Ban - Council Unaware Of Flaw In Action On South Africa". The Seattle Times. p. C1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  134. Lane, Bob; Pryne, Eric (January 6, 1989). "South African Stone Blocks Bus Tunnel - Metro Rejection Means $500,000 Increase In Cost, Delay In Completing Two Stations". The Seattle Times. p. B1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  135. Lane, Bob (January 25, 1989). "S. African Granite Flap: Metro's Story - Gibbs Concedes Error In Buying Stone But Says Public Wasn't Misled". The Seattle Times. p. B2. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  136. Pryne, Eric (January 27, 1989). "Firings Sought Over Purchase From S. Africa - Sims Demands Metro Tell Who OK'd Using The Granite In New Bus Tunnel". The Seattle Times. p. E1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  137. Pryne, Eric (February 7, 1989). "Agency May Force Metro To Keep Granite - No Decision Made Yet On S. African Stone". The Seattle Times. p. B1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  138. Lane, Bob (March 10, 1989). "Report To Metro Finds No Cover-Up On Granite - Committee Tries To Heal Wounds Over South African Stone In Tunnel". The Seattle Times. p. C1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  139. Lane, Bob (February 26, 1989). "The Man Who OK'd S. African Granite - Kalberer Got High Marks For Bus Tunnel Project Before Ugly Episode". The Seattle Times. p. D1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  140. Pryne, Eric; Lane, Bob (February 23, 1989). "Metro Chief Gibbs Resigns - S. African Granite Dispute Is Cause". The Seattle Times. p. A1. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
  141. Lane, Bob (September 8, 1989). "Sandaas Named To Head Metro". The Seattle Times. p. C4. Retrieved July 20, 2016 via NewsBank. (subscription required (help)).
KML is from Wikidata