The 21st Century Network (21CN) programme is the network transformation project of the UK telecommunications company BT Group plc for data and voice. It was intended to move BT's telephone network from the AXE/System X Public Switched Telephone Network (PSTN) to an Internet Protocol (IP) system. As well as switching over the PSTN, BT planned to deliver many additional services over their new data network, such as on-demand interactive TV services.

BT originally stated that it would accrue annual savings of £1 billion when the transition to the new network was completed, and hoped to have over 50% of its customers transferred by 2008 (see External links below for current progress on the roll-out of optical fibre.) Capital expenditure was put at £10 billion over five years, this being 75% of BT's total capital spending plans in that period.

21CN has been heavily delayed and is yet to roll out in many parts of the United Kingdom, where the legacy circuit-switched network is still in place.

21CN architecture

The new network is based on an architectural model of five classes of network nodes. These are:

Premises

Premises nodes includes residential, small-medium enterprise (SME) and enterprise. The presumption is that all these will have high speed connections to the network, delivered over copper (in the form of ADSL or other DSL technologies) or over fibre, as either PON or direct fibre in the case of large enterprises. The sole exception to this presumption is for legacy PSTN, where provision will continue to be made for analogue voice.

Access node

21CN introduced the concept of the multi-service access node (MSAN). This logical node takes the various access technologies (mentioned above) and, where possible, aggregates these onto a single backhaul network technology. This includes converting analogue voice into voice over IP (VoIP) using the MSAN as a media gateway (MGW). The aim is to implement a few hundred access nodes.[1] Note that these will not have any IP routing capability, but will essentially be layer 2 Ethernet devices.

Metro node

The backhaul network will terminate on the metro nodes. At this point the IP-based services will be implemented, and the metro nodes are the first location where IP traffic is routed. Call control (via a softswitch or an IMS CSCF) will be implemented here, although the softswitches and the IMS components won't be described as a part of the metro node - they are parts of the iNode. The metro nodes are also provider edge (PE) routers in MPLS terminology, encapsulating the IP traffic in MPLS tunnels for transmission over the core. The aim is to implement around 100 metro nodes.[1]

Core node

The core nodes are MPLS switches, with the MPLS traffic carried over optical (DWDM) transport. They are completely unaware of customer IP traffic, and only switch based on MPLS tags (all customer IP traffic is encapsulated with an MPLS header by the metro node PEs). Native IP is only used by the core nodes for protocols such as MP-BGP, an IGP, LDP, and RSVP to exchange routing and label information between all core and metro nodes. The aim is to have approximately 10 core nodes.[1]

iNode

iNodes are the logical nodes that provide the control for the services implemented using the other 4 nodes. BT has announced that it intends to create an IMS based iNode capability, although its initial PSTN replacement will not be an IMS implementation. The iNode will implement a set of standardized functions - common capabilities - that deliver layered services. Common capabilities include session management, authentication, profile, address book, presence and location. Combinations of these capability primitives will be used to deliver different service types and functionality.

The iNode is built upon the AXE telephone exchange TSS (Telephony Softswitch Server) and is currently using HP Alpha processors (APZ 212 50) as well as the IS-Blade in the APZ logic. After extensive field testing in the South Wales Pathfinder area, all current logical and intelligent network services now operate in conjunction with the existing PSTN and the MPLS network.

Differences

The most significant differences between the legacy 20th century network (20CN) and 21CN are:

Suppliers

In April 2005, BT announced that it had selected eight suppliers for its 21CN roll-out. These were:

Alcatel and Lucent merged in December 2006 to form Alcatel-Lucent.

The fact that Britain's Marconi received no major 21CN contract was a surprise to commentators and sent the company's shares tumbling. An example of analysis before BT's announcement is Dresdner Kleinwort Wasserstein's: "[Marconi is] so advanced with its products and so entrenched with BT Group plc that its selection looks certain."[2]

Criticism

The plan has come under some criticism, mainly due to BT's plans for broadband internet access services. BT's main plan for providing Internet access is to upgrade their DSLAMs to ADSL2+ in the exchange. This has been controversial because ADSL2+ is already an old technology and is limited to 24Mbit/s downstream,[3] and will be even more dated by the time 21CN is completed. This has led to criticisms that BT is not future proofing their network, since fibre, while more expensive to lay, is a lot more future proof. Critics argue that fibre to the home would be more appropriate, which would mean replacing the current copper wire which supplies individual homes (the "last mile").

Potential issues

Any chain is only as strong as its weakest link, and in the case of 21CN, its weakest link the access network is also its most valuable. Although the architecture of 21CN simplifies the network plant, it does not look to solve the problem which will have the greatest effect on data rate, that is loop length i.e. the length of cable from the exchange to the customer. Unlike the active core network, the access network is a passive network and has no capability for self-discovery. Reasonable consumer expectations can be established based upon the length and characteristics of these wires. A more global model would require precise knowledge of wire material (e.g. copper or aluminium), where the wires are routed, and the direction in which traffic flows around the circuit. This information is not held at present, and would need significant effort to obtain.

By moving the MSANs deeper into the network, i.e. to street side cabinets, length issues are more likely to be reduced; however, line transmission characteristics are still highly variable since lines may be bridged with materials other than copper (such as aluminium) which have a degrading effect on conductivity and hence signal strength. In addition changes in wire gauge (thickness) are common and introduce signal reflection due to changes in impedance.

The original 21CN roll out did not look to drive MSANs deeper into the network; instead it locates them in each exchange. Without detailed information on the critical local routings, it is very difficult to ascertain what capacity remains in the duct network and which connections run through it. This makes planning of future upgrades or fibre additions difficult. Openreach is looking at the possibility of integrating MSANs into the access network, although this was originally deemed unlikely to happen because there are only 5,600 exchange buildings and over 85,000 'primary connection points', which usually come in the form of street cabinets.

However, in July 2007, Sir Christopher Bland, the chairman of BT stated that BT was considering fibre to the kerb and that VDSL2 was a 'likely development going forward'[4] and in October 2007, Ofcom launched a consultation into Next Generation Access Networks in the UK after pressure from the government.

Subsequently Openreach began a rollout of VDSL2 FTTC technology over 21CN, deploying DSLAMs in thousands of new street-side cabinets (see External links below). BT Retail launched their BT Infinity service in 2010[5] and expect to continue expanding availability by installing new cabinets until at least 2014.[6] The FTTC deployment essentially installs a small (96-288 line) DSLAM into thousands of street cabinets, each backhauled using direct fibre to a larger exchange or metro node, removing much of the local-loop length limitations and allowing end-user speeds exceeding 100 Mbit/s following future upgrades.

In late 2009, British ISP Andrews & Arnold reported severe issues with 21CN, citing multi-hour outages due to single points of failure and said that 21CN was not "fit for purpose" due to this and numerous other problems.[7]

See also

References

  1. 1 2 3 "BT information on 21CN technology in the UK". Btplc.com. Archived from the original on 2012-07-02. Retrieved 2012-09-20.
  2. Le Maistre, Ray (27 April 2005). "Analyst: Marconi in Line for 21CN". Light Reading. Retrieved 2006-11-28.
  3. "BT's 21CN has 100 users". The Register. 2006-11-28. Retrieved 2007-12-04.
  4. Meyer, David (2007-07-19). "Outgoing BT chief hints at fibre rollout". ZDNet. Retrieved 2007-08-08.
  5. BT launches 40 Mb BT Infinity broadband service Macworld UK, published 2010-01-22, accessed 2010-10-27
  6. Fibre Broadband (FTTC / FTTH) Guide Thinkbroadband, accessed 2012-04-21
  7. Kennard, Adrian (2009-09-08). "BT single box design, still". AAISP. Retrieved 2013-11-09.

External links

This article is issued from Wikipedia - version of the 10/30/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.